Long Island’s latest skate park – 110 Skate Park is set to open mid January and just posted park layouts designed by Team Pain. Space looks huge and has a nice mix of street & tranny with some breathing room. They even included a seperate beginners area! Check some more layouts and specs below:
Park features include:
- Multi-depth bowl with 2 hips (from 5’6″ to 7′ deep)
- Roll-in / Bank
- 7 stairs with handrails and hubbas
- Bump to ledge
- ¼ pipe with bowl corner and extension
- Flat ledge
- Mellow hubba / up ledge
- Tranny hip
- Tight & low ¼ pipe w/bowl corner
- Jump pike
- 4 stair with hubba and handrail
- 2 stair with flat rail
- Gap to hubba
- Granite many pad
- Euro gap
- Step-up ledge
- Hip pike
- ¼ pipe with extension
- Escalator
- China bank
- Roof gap with ledge
- Bump to down rail
- Loading dock / kicker pike
- Separate beginners area
- Fenced in spectators area for the bowl
(info via the 110 Skate Park Facebook page)